Contact

Contact and RFQ

Send your drawing, height requirement, environment, and quantity so we can guide the next quotation step.

Contact and RFQ

What helps us quote faster

Project scope

Route dimensions

Share climb height, angle, landing points and any parapet, tank or platform transition.

Project scope

Photos or sketches

Phone photos, marked-up screenshots or a simple drawing are enough for the first review.

Project scope

Environment and finish

Tell us if the route is indoor, rooftop, coastal, wastewater or wash-down exposed.

Project scope

Quantity and timing

Approximate quantity and tender timing help us respond at the right level of detail.

Factory location

Jingxing Mining District, Shijiazhuang City, Hebei Province, China

View on Google Maps

RFQ form

How to get a faster first review

Include drawing files, product direction, environment, and finish target so the first reply can stay specific.

If the project is active, leave your WhatsApp number so drawing questions and follow-up can move faster.

RFQ prep

Useful files before you submit

These downloads help align finish direction, installation basis and RFQ scope before your final message goes out.

RFQ and Drawing Submission Checklist
Downloads

RFQ and Drawing Submission Checklist

A buyer-facing checklist that improves quotation efficiency.

Download PDF
Material and Finish Selection Guide
Downloads

Material and Finish Selection Guide

A practical guide to finish selection based on humidity, coast, cleaning, and lifecycle expectations.

Download PDF
Installation Checklist
Downloads

Installation Checklist

Useful for internal review before ladder or platform installation starts.

Download PDF

Talk to our factory team

Use email, WhatsApp, or the RFQ form to start a project discussion.